Manufacturing Reinvented
A modern solution to an old problem.
No more time clocking
Accurate planning directly based on real manufacturing times measures.
All-in-one
MRP, Quality, Maintenance and PLM fully integrated.
Realtime Communication
Display worksheets, quality alerts to workers during operations.
Shop floor automation
Capture data in real-time from your equipment using the API.
The MRP software Toyota loves.
USED AND TRUSTED BY
All you need in a single software
Easy + Powerful = Valuable
Engineering
- PLM
- Bill of Materials
- Versioning
Manufacturing Engineering
- Routings
- Worksheets
Manufacturing
- Planning
- Control Panel
- Work orders
Supply Chain
- MPS
- Routes
- Procurement Rules
Quality
- Control Points
- Checks (SPC)
- Alerts
Maintenance
- Equipment Management
- Maintenance Requests
Workcenter Control Panel
Track Time
Display Worksheets
Register Production
Integrate
Quality checks
In Process Alerts
Record
Serial/lot number
Optimize your inventory level
Through accurate fulfillment propositions.
Use make-to-order rules, minimum stock rules or the master production schedule to automate procurements. Let the scheduler compute everything for you. Use routes, constraints and lead time to optimize inventory level and avoid shortages.
Odoo allowed our company to efficiently manage a growth from a turnover of $2.4m to $15m in 4 years.
Barcodes,
out-of-the-box
Whether you use lots, serial numbers or unidentified products, you can use barcodes to speed up operations at every step:
- Reception control
- Picking
- Packing
- Work orders
- ...and more!
Great Reporting & KPIs
All the data you need at your fingertips.
Control your productivity with real-time Overall Equipment Efficiency (OEE) reports and monitor the 6 big losses of TPM. Track maintenance KPIs like MTTR and MTBF. Create customized dashboards to monitor performance in real time.
Dynamic reports on everything from costing to traceability, performance analysis, OEE, and more help you make smarter decisions about your business.
Fully integrated with other Odoo Apps
7 Million user
grow their business with Odoo
Unleash your growth potential
Join us and make your company a better place.